Exhibit booth building and construction related rules, do you know
2012-10-22 14:54:00 点击数: 来源:毕加企划部
At present, the Canton Fair Phase II work is hot exhibition, the major exhibition design companies have sent the engineering staff, this time determined to do our best booth structures. However, in the stand construction process, for different zones, different pavilions have different requirements, and now we list the approximate number of requirements out for the major exhibition design companies, exhibition planning units and the majority of exhibitors Suppliers reference.
In the Pazhou Complex, designated booth contractors have a lot, but the requirements are the same.
1, booth structures must be built within the designated range organizer.
2, Pavilion exhibition hall are not allowed to light a fire, for hot work (open flame, welding, gas welding), it must have been declared by the Security Department contractor, obtain hot work permit approval and do preventive work site before construction or performances. Failure to follow the procedures and operator without welding certificate, be investigated party liability.
3, booth exhibitors to hire designated contractor for booth special equipment engineering, shall pay the exhibition hall square construction management fees. Submit exhibition design plans and reported that construction work performed.
4, booth electricity supply will be closed thirty minutes after the exhibition daily, if necessary twenty-four hours electricity supply, please contact the contractors as soon as possible and with an extra charge.
5, all stand structures not capped, the ceiling is not less than the distance 50CM, less than the distance from the wall 60CM.
6 Do not use fuel or flammable materials to build and renovation, fire-fighting equipment shall not be used for other purposes, structures and exhibits may not obstruct fire hydrants, fire exits shall not be occupied.
7, all exhibitors must not use universal power sockets and plugs.
8, all drawings must be submitted one week before the exhibition organizer review, booth drawings should include positive side, cross-sectional view, indicate size, material, there must be text and electricity load, along with circuit diagrams, the contractor has the right to refuse design Figure, or require exhibitors to make changes.
More than eight are exhibitors need to pay attention, but also the various exhibition design companies need to thoughtful customers. The real exhibition planning company, must be well aware of these circumstances. Only by understanding the pavilion's requirements in order to truly for all exhibitors wholehearted service to the booth construction work best. Picasso exhibition, it has been the case.